If your electric bill says Tucson Electric Power or TEP, start here. TEP serves southern Arizona. AER's main territory is Yavapai County, so check your bill to see which utility you have.

Reviewed November 5, 2026 against the sources listed at the bottom of this page.

This is general planning information for TEP customers thinking about solar, a battery, or a different rate plan. It is not utility, engineering or tax advice. Rates and rules change, so confirm anything you rely on with TEP.

TEP's residential plans

TEP lists four residential pricing plans.

  • Time-of-Use. Lower prices during off-peak hours, so shifting use to those hours lowers the bill.
  • Peak Demand. Lower energy prices plus a charge for your highest hourly on-peak usage.
  • Demand TOU. Combines the time-of-use and demand pieces.
  • Basic. You pay on total monthly use, whenever it happens.
  • TEP notes that some plans are frozen and not open to new customers, including current customers who move. Ask TEP which plans are open to you.

If you have solar: the export rate

TEP pays for excess solar through the Resource Comparison Proxy (RCP) export rate. TEP's page lists $0.0462 per kWh in effect from October 1, 2026 through September 30, 2027. The rate is based on average market costs for solar energy over a recent five-year period.

TEP says customers who requested interconnection since September 20, 2018 are paid the RCP rate in place when they requested interconnection, for up to 10 years. The rate is adjusted each year, and Arizona Corporation Commission rules do not let it fall more than 10 percent in a year. It shows on the bill as Excess Generation Credit.

TEP updates this rate every year. Confirm the current number on tep.com before you rely on it.

What a battery can and cannot change on these plans

  • On a time-of-use plan, a battery can hold solar or off-peak energy and use it during on-peak hours. How much depends on the battery size, how it is set up, and what your home runs at that hour.
  • On a plan with a demand piece, a battery set up for the on-peak hours can lower your highest hour. It has to be sized and programmed for it.
  • The export rate is much lower than the price you pay for power, so using more of your own solar at home usually matters more than sending it out.
  • Backup and bill management compete for the same battery.

Questions to ask before you choose a plan or sign

  • Which TEP plan will I be on, and is it open to new customers?
  • Which export rate did the installer assume, and when does my 10-year period start?
  • Does the proposal show a bill under the plan I will really be on?
  • Bring 12 months of TEP bills.