Energy vs. power
Why kWh and kW answer different questions—and why a backup plan needs both.
Ask about this topicExplore the concepts that shape solar, storage, backup, hybrid, off-grid, rural, and commercial energy decisions—without reducing a complex property to a generic rule of thumb.
Use the Energy PlannerThese educational cards introduce the questions behind a project. They are designed to make a consultation more productive, not to replace a property-specific review.
Why kWh and kW answer different questions—and why a backup plan needs both.
Ask about this topicA practical method for deciding what should keep running during an outage.
Ask about this topicThree architectures with different operating assumptions, constraints, and opportunities.
Ask about this topicWhy water systems require attention to motor starting, runtime, and priorities.
Ask about this topicStored energy and delivery power work together, but they are not interchangeable.
Ask about this topicHow generators can support an intentional solar and storage architecture.
Ask about this topicPower is the rate at which equipment needs electricity. Inverter capacity, simultaneous loads, and motor starting are power questions.
Energy is how much electricity is used over a period. Runtime, usage patterns, and battery capacity are energy questions.
These answers explain the planning concepts. Final design decisions need a property-specific review.
That depends on the system architecture, equipment, safety controls, and backup design. Solar generation and outage operation should be evaluated together rather than assumed to be automatic.
Battery capacity describes stored energy over time. Inverter power describes how much electricity can be delivered at once. Both matter when defining runtime, simultaneous loads, and start-up behavior.
It may be possible, but the answer depends on the equipment’s operating and start-up demands, runtime goal, electrical configuration, and other loads. A property-specific evaluation is important.
No. The Planner is an early planning tool. Final design, engineering, equipment selection, site evaluation, utility approvals, permitting, pricing, and installation scope are separate steps.
From a well pump to a commercial kitchen, the useful answer depends on the equipment, the operating conditions, and what success means to the owner.