SRP solar price plan, demand charges and batteries
If your electric bill says Salt River Project or SRP, start here. SRP serves parts of the Phoenix area. AER's main territory is Yavapai County, so check your bill to see which utility you have.
Reviewed November 5, 2026 against the sources listed at the bottom of this page.
This is general planning information for SRP customers thinking about solar or a battery. It is not utility, engineering or tax advice. Rates and rules change, so confirm anything you rely on with SRP.
The SRP solar plan
SRP's Customer Generation Price Plan is the plan SRP describes for homes with rooftop solar. SRP says the energy charge is about half the rate of its Time-of-Use plan, the lowest of any SRP residential price plan.
The tradeoff is a per-kilowatt demand charge on the energy you buy from SRP. The demand charge is based on the 30-minute interval during on-peak hours when your home uses the most electricity.
On-peak hours
- November through April: weekdays 5 AM to 9 AM and 5 PM to 9 PM.
- May through October: weekdays 2 PM to 8 PM.
- All other hours are off-peak, including weekends and six observed holidays.
This plan is being retired
SRP's page says the Customer Generation Price Plan will be discontinued as of the November 2029 billing cycle. The SRP Board approved retiring select price plans on February 27, 2025. SRP publishes details at srp.net/resprices. If you are planning solar on SRP, ask which plan you would be moved to and what it would cost.
What a battery can and cannot change on this plan
- Because the demand charge follows your highest 30 minutes during on-peak hours, a battery set up for those hours can lower that peak. It has to be sized and programmed for it.
- SRP's own advice is to use major appliances one at a time during on-peak hours. A battery does not replace that habit, but it can help.
- Backup and bill management compete for the same battery. Energy held back for an outage is not available to cut a peak.
Questions to ask before you choose a plan or sign
- Which SRP plan will my system be on, and what happens to it after the Customer Generation plan ends?
- How does SRP credit the power my system sends to the grid on that plan?
- Does the proposal show a bill with the demand charge included?
- Do my large loads run during the on-peak window?
- Bring 12 months of SRP bills.