Hybrid systems connect solar production, battery storage, critical loads, and grid interaction into a coordinated energy architecture.

Build My Hybrid Plan
Planning pathway
Who this is for

Property owners who want outage capability without losing the flexibility of a grid-connected home or business.

The design question

The architecture needs to define what remains energized during outages, how the system recharges, and how equipment constraints affect the plan.

How it works

See where your power comes from.

Pick a situation and watch the colored dots move. They show what a system like this is doing at that moment, and why a grid-tied system behaves differently from one with a battery.

Solar runs the house and fills the battery. Solar power flows to the inverter. Solar power flows from the inverter to your home. The battery is charging from solar. Extra solar power flows out to the utility grid.HybridinverterSolarProducingUtility gridTaking any extraYour homePowered by solarYour homeBatteryChargingGGeneratorNot needed
Solar runs the house and fills the battery.

Your solar powers your home first, tops off the battery, and any extra can go back to the grid, depending on your utility plan.

  • Solar power flows to the inverter.
  • Solar power flows from the inverter to your home.
  • The battery is charging from solar.
  • Extra solar power flows out to the utility grid.

Illustration only. A real design depends on your equipment, the loads you choose to back up, and a site review.

Try it with your own numbers in the Energy Planner

What AER evaluates

Questions that help shape the right next step.

Early planning does not replace final engineering, permitting, site evaluation, equipment selection, or contractual proposals. It gives those steps a more informed starting point.

01

Backup boundary and critical-load panel strategy

02

Inverter power and surge requirements

03

Solar-to-storage charging relationship

04

Generator compatibility and load management

Avoid a false sense of readiness

Common ways a system plan gets simplified too soon.

These are not reasons to delay a project. They are reasons to ask more useful questions before the property is committed to an approach.

Calling any grid-tied system a backup system

Skipping circuit-level decisions

Assuming all solar will operate during an outage

Not coordinating the generator with storage behavior

Start the planning conversation

Organize the first inputs before a project review.

The separate Energy Planner considers usage, critical loads, storage, power, and runtime. Use it for a structured preliminary plan, then bring the results into a Project Review.

Use the Energy Planner
Ready to frame the project?

Bring the property question. We’ll help make the system conversation more useful.